Thursday, 1 March 2012

The bannister rail

Replacing the bannister spindles (balusters, technically; who knew?) which had been inexplicably removed by previous occupant or occupants unknown proved more difficult than it should have done. It seems that they removed the old balusters and filled in the rebate that they sat in somehow. This meant that I had to work out a way of fixing new ones securely.

I didn't want to rebate out the stringer (I think that's what it's called) as I didn't know what was in there in terms of screws/nails etc and brackets would have been expensive. In the end I settled for a large dowel drilled and glued through the top of the rail and two or three big nails driven through the bottom of each baluster into the string, all topped off with wood filler. I broke two drill bits during the process and the balusters at the top required a slightly different approach but all in all it worked pretty well. It also came in nice and cheap at ~£15 for the timber from the timber merchants not B&Q where the same material would have been 4 or 5 times the price. Covers for timber from now on.

The non-standard spacing of only 7cm (instead of the regulation 10) between balusters would help to reinforce the joinery in the unlikely event of someone falling through it too. I would like to claim that this was done on purpose but it was, in fact a miscalculation. I cut a 9.5cm spacer block to ensure that they were all uniform and then bevelled it, effectively reducing it to 6.8-ish. I realised this around the third baluster so it was too late to change it. I estimate that it meant I had to fit 4 or 5 extra spindles but that's not a big problem.


Obligatory "behind bars" shot


These two shots illustrate a couple of more unusual dowel placements
at  the top of the staircase.

Sonia begins cleaning up all the glue and filler.

And a coat of primer before gloss.

Saturday, 25 February 2012

Finishing the Spare room/Study/Nursery

Now we've moved into the master bedroom I have been able to do the spare room. A record-setting 8 day job including all painted surfaces, re-fitting and priming some skirting board, wallpapering one wall and three (!) coats of paint on the others to get rid of the awful blue colour and filling all the cracks and re-painting the ceiling.

No in progress photos of this one. I was too busy decorating.

Work area. Already a mess.

I knew the wallpaper would go nicely. I'm glad I kept my own counsel on that one.

You can just see a small bump on this picture. Sorry baby, I know you hate it. You look pleased with my handiwork though.

Sunday, 15 January 2012

Womb for a little one?

Spud at 8 weeks 
So, some of you may know, there is going to be an addition to the Davies family. We are very excited to share with the world that we are having a baby! We are 14 weeks pregnant and so far all is going well, no morning sickness, no real cravings... apart from maybe peanut butter and sandwich pickle.... together on a spoon, but that might just be down to me thinking I am 'allowed' peanut butter!

So, we had a scan at 8 weeks and first saw our Spud, you will understand if you take a look at the picture! 12 week scan was on Tuesday 10th and all is well, everything measuring normal and looking great.... less like a spud! 'very advanced for its age' has been said many times... mainly by Sid.



Spud at 13 weeks 2 days 

So.... the house plans have been expedited somewhat due to a baby arriving in July... (due the 15th) I stripped the wallpaper on the wall in the spare bedroom/study/NURSERY yesterday and Sid is painting the walls as I type.

Thursday, 12 January 2012

Finishing the bedroom


Well, despite our good intentions a series of minor obstacles and one major one prevented getting into the bedroom by Christmas. Ah well, the best laid plans and all that.


Ideally, we would have liked to finish all the painting by the time the carpet went in but when your carpet fitter is doing it as a favour and for a very reasonable price you get it done when he can. We're very pleased with the result though.




Thankfully, Charlie was on hand to help us mask it all off before we painted. And what a good and thorough job he did. Cheers mate!



The light fitting had to move from the wall to the ceiling which meant running a new cable from the junction box in the loft to a new pendant in the ceiling.



Not too tough a job but I'm no electrician so I was very careful to research exactly what I was doing. I also made Sonia turn the fuse on with a broom handle but as you can see, it worked.

With the light moved I could paper the feature wall. We managed to find the exact wallpaper I wanted in Wilkinsons at less than half price! I should probably have used lining paper under the wallpaper but it still looks pretty good anyway.










You may wonder why the window surround has not been painted. Well, while Charlie was sanding the wood down above the window, he noticed that the wall was wet. We brushed it off: "It's just cold/condensation." we said; "It will be fine." we said and went to the pub.

It wasn't. A few days later, the paint was still not dry, the wallpaper had bubbled up, the damp meter was reading "red" all over and we were fearing the worst. On top of that, the loft was dripping with condensation and I was fearing for all the books that we have stored up there. I covered them up with a tarp but knew it could only be a temporary solution.

To make matters worse, that night we discovered damp in the spare bedroom; the one we were sleeping in. The radiator had not been working since we moved in. We had figured that we sort it when we'd moved into the main bedroom and we had the space to move around but with the encroachment of fungus on the skirting we knew it had to be fixed asap. Thankfully, a couple of hours, a google search or two and a few sharp taps with a hammer (and a lot of swearing) freed up the valve. The radiator sprang into life instantly and within seconds we had heat. And there was much rejoicing.

However the whole drippy, dank, depressing episode had brought us to our lowest ebb so far.

The next day, an inspection outside turned up a likely culprit. The gutters surrounding the front of the house were overflowing with unwanted flora and we'd had some heavy rain. This meant an awful lot of water had been running down the walls. We enlisted Simon to come and have a look. Luckily, he'd been doing some window cleaning so he and Derek were able to pop round and clear the gutters out. They also found a missing tile or two so pulled the waterproof membrane over to cover the hole. Thankfully, this pretty much solved the problem and we were able to finish the painting.

This delay cost us a couple of days and our dream of sleeping in the bedroom before Christmas as, despite the holes being plugged, the wall was still sodden and we couldn't put curtains up. However, Simon and Derek's intervention meant that we were able to face the Christmas holiday without worrying about the damp too much. Thanks guys!


We returned from our Christmas and New Year break to find the damp all but gone. On the weekend following our return Gary, Anna and Jaimi came up to fix the missing roof tiles and help us put up the curtains properly. We finally managed to spend a night in our new bedroom on the 6th January. Not too bad considering the delays. The bedroom is now finished except for new furniture and we can move on to the next area of the house. Two rooms down!







Monday, 19 December 2011

Wallpaper is your friend

Given the frankly wretched state of the walls we decided that the only way forward was to wallpaper using a textured paper that could then be painted. Given that neither of us had done this before we set to work with a not insubstantial amount of trepidation but soon gained confidence...







...a little too much confidence.





It turns out that wet wallpaper is easy to tear. And yes, that was the first piece I put up, yes I did swear and yes, Sonia had already told me that that was likely to happen if I wasn't careful. She is pulling her best "I told you so" face in that picture, having stopped laughing at me. So, in revenge, this is Sonia on our lunch break.

Is that a good sandwich baby?

After this though everything went pretty smoothly and by the following afternoon, the wallpaper was done!







Friday, 25 November 2011

The Dining Room




Living in a building site was starting to grate, so Sid spent some time making the dining room a nicer place to spend time. First coving, Sid got to use his mitre saw to cut the angles and had a frustrating afternoon in the garden trying to cut the coving... at one point our garden looked like a place where bad coving goes to die... badly cut angles in a pile. Sid is nothing if not persistent and succeeded, doing a good job!










 Next, painting. We had Dulux paint mixed , 'Russian Velvet 2'. At this juncture we discovered two things. A, Dulux Vinyl Silk takes 3 coats to cover sunshine/grubby yellow and, B. I cannot paint. Which is a little embarrassing considering that my dad was a painter and decorator and that I had huffily informed Sid... 'of course I know how to paint properly....' He worked on one side and I the other (for a very short time) until he discovered my lack of skills, I had Russian Velvet all over me and all over the brush.... and not so much on the wall.



Look at the concentration...

They say romance is dead.... it does look like a bum though.!

Ta Daaa!! 


Pippa!


Slightly off topic, but on the 8th of November Pippa Talbot arrived! Adorable! I fell in love instantly. So we took a weekend off the house and went to meet our beautiful new niece.



Precious 

Uncle Sid.


My first Hoodie!!